top of page

Educational

Cloverhill Christian Academy

J.L. Minter provided preconstruction and budgeting assistance throughout the planning phase and was subsequently awarded the electrical contract for a new 27,000-square-foot classroom building serving elementary school students.

Working closely with the project team during design and budgeting, J.L. Minter helped develop cost-effective electrical solutions that aligned with the project’s goals and schedule. The scope of work included the installation of complete electrical systems to support modern educational spaces.

​

Project Details

​

Customer:  Century Construction Company, Inc.

Owner: Cloverhill Christian

Architect: Michael Graves

Area: 12,000 SF

Market: Educational

Completion: 2023

arrows2.png

Our Lady of Lourdes Catholic School

J.L. Minter was awarded the electrical construction contract for a new 11,400-square-foot gymnasium and classroom building. The project was developed to provide expanded educational and recreational space, supporting both academic programs and student activities.

The electrical scope included the installation of complete power distribution, lighting, and associated electrical systems throughout the facility. Special consideration was given to the unique requirements of the gymnasium and classroom environments, ensuring reliable, energy-efficient systems that promote safety, functionality, and occupant comfort.

​

Project Details

​

Customer:  Century Construction Company, Inc.

Owner: Our Lady of Lourdes

Architect: Huff Morris Architects

Area: 11,440 SF

Market: Educational

Completion: 2025

arrows2.png

William & Mary, Alumni House

JL Minter was selected to work through the design and budgeting processes and performed electrical system installation for the 40,000 sq. ft., three-level addition and limited renovation of existing Alumni House. Detailed installation was required throughout the facility including in the ballroom and pre-function areas due to the architectural nature and symmetry of the space. Ballroom work included layout and installation of eight 200 lb. chandeliers mounted 16 ft. above finished floor, along with cove and recessed lighting. The project also included installing a 120 ft. duct bank, 2500-amp service, 125kw generator, fire alarm system and detailed commissioning procedures. The project was completed on time and within budget.

​

Project Details

​

Customer:  Kjellstrom + Lee

Owner: William & Mary

Architect: Glave and Holmes Associates

Area: 40,000 SF

Market: Commercial

Completion: 2020

arrows2.png

William & Mary Swem Library

arrows2.png

Other educational clients include:

•  St. Michael's Episcopal School

•  Trinity Episcopal School

•  VCU Math Exchange

JLM_logo_rev.png
JLM_logo_rev3.png

14400 Justice Road, Midlothian, VA 23113

804.232.4093  |  info@JLminter.com

SWAM_LOGO_small.jpg

© 2025. JL Minter   |  State Reg: 2701 008721A

bottom of page